January 2020 - The new buffet seating area has landed!  There is much more work to be done with the construction of a covered link between the kitchen and building.  The white door on the kitchen seen in the photos (uncovered prior to delivery) will now not be used given the revised positioning of the building and will be re-covered. The other door on the kitchen, nearest road will be uncovered instead for the covered link.Also a ramp needs to be constructed in front of the doors to allow disabled access.

Over time additional picnic benches and planters will be added on the pad increasing the outdoor seating space and further enhancing the appearance.

Photo: A Coley

Photo: A Coley

Photo: A Coley

 

 

 

 

 

Painting of the building to match the kitchen exterior will also be required as time and weather allows.

Photo: A Coley

Photo: A Coley

Photo: A Coley

 

 

 

 

 

A counter is to be built inside and the tills and coffee machines moved in from the kiosk. Plumbing for the coffee machine and electrical connection works are also required.

Photo: A Coley

Photo: A Coley

Photo: A Coley